bonegroup
bonesteel
enobfire skeltononsite
 
Profilemeet the teamFacilityoff-siteon-siteRecent ContractsContact
 
       
   
ASDA Store and Car Park
Location: London, UK
Client: ASDA Stores
Main Contractor: Carillion Building
Steel Fire Protection: 2,000 tonnes/1 hrs (Off-Site)
K2
Location: London, UK
Client: Rowecord Engineering
Main Contractor: Taylor Woodrow
Approx Tonnage: 1 hrs (On-Site)
Wembley Stadium
Location: London, UK
Client: Multiplex Construction
Main Contractor: Multiplex Construction
Steel Fire Protection: 6,500 tonnes/1 hrs Ameron (Off-Site)
 
       
   
 
  bone groupbonesteelenobfireskeltononsite
 
Home | Meet the Team | Facility | Off-Site | On-Site | Recent Contracts | Contact

bone group home
© copyright 2005 web design by Work Interactive